Replacement of flat roofing system to block of flats
Ground stablisation scheme following a land slip. Ground anchor system and piled raft with gabion baskets. Structural repairs to property below
Grade 2* listed property, escape of water caused internal damage to multiple rooms which included chestnut laths and lime plaster repairs with listed building lime based paints
Investigation of leak to underground services and subsequent reinstatement of stonework paving to outside swimming pool
3 phase works - Complete roof replacement, One coat render system to office block, car park tarmac renewal